Project Description

MHIC, located on the banks of the Delaware River near Philadelphia, PA, is a LPG, refined products and crude terminal as well as a fully functioning processing complex.

Projects

  • Mariner East 2 (ME2) OSBL Pipeline Project: ME2 will deliver NGLs from the Marcellus and Utica Shale areas in Western Pennsylvania, West Virginia and Eastern Ohio to the MHIC
  • ME2 13kV Transmission Line Design Project
  • New Flare Design Project

Additional MHIC Experience

  • Gasoline Blending FEL1 and FEED Packages
  • Critical Load Electrical Power Assessment
  • New HP Steam Line and Hewes Avenue Steam Supply
  • Steam Optimization Study and Modifications
  • Cooling and Waste Water Piping Modifications
  • Multiple Jumpover Piping Projects
  • Early Mariner East 1 Piping Connections
  • Demolition of Piping, Pipe Racks and Structures and Utility Reroutes
  • Boiler Root Cause Failure Analysis
  • Mariner East 2 13kV Transmission Line Design
  • PM, Cost Control & Scheduling Support for Mariner East 1 Project
  • Temporary Flare Study and New Flare FEL1 Package
  • Conversion of cavern from butane to propane storage
  • Substation 4 and 5 Modifications and Power Feeds to Docks
  • Arc Flash Analysis and Training
  • Project Management of Butane and Natural Gasoline Projects
  • Return to service of Pipeline between Marcus Hook and Trainer Refineries