NYPA Sensor Project
Imperia Engineering Partners has been awarded the Engineering for the Northern and Western Regions for Phase II of the NYPA sensor deployment program. Imperia has completed Phase I Engineering for the same regions.
Elimination of Drywell-to-Wetwell Differential Pressure
Imperia performed state-of-the-art analyses to allow our client to operate their plant in a zero ∆P condition
Power Delivery: AIS and GIS Expansion Project
Client: PSE&G - Engineering & design and procurement services to install new 69kV GIS Building and Control House for upgrades from 26kV to 69kV at Delair and Mount Holly GIS Stations and for three new 69kV AIS Stations (Ridge Road, East Riverton, Riverside)
Nuclear Plant Digital Process Protection System (PPS) Replacement
Imperia provided owner’s engineering and licensing support for the replacement of the Eagle 21 Process Protection System (PPS) with a digital platform
Case Study: Cumberland Station Expansion
Conectiv Energy — Millville, NJ. Owner’s Engineer and BOP Detailed Design for 100MW simple cycle plant (GE LMS100).
Eagle Point Power Generation – Energy Recovery Project
Imperia evaluated potential uses for the unused steam. This included both Power Augmentation (steam injection into new combustors) and installation of a second condensing steam turbine.
Marcus Hook Industrial Complex (MHIC)
LPG, refined products and crude terminal,as well as a fully functioning processing complex. Mulitple projects including: Mariner East 2 (ME2) OSBL Pipeline Project, ME2 13kV Transmission Line Design Project and New Flare Design Project
Project Controls Supports Efficient Execution
Project management techniques, combined with deep industry expertise, reduce risk and deliver successful projects